City of Brampton Logo

Professor's Lake Recreation Centre

page banner

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​

​​​​​​​​​​​​​​​​​​​​​​​​​​​​Reviewed: 12/09​​​​​​/24​​

This project invests in a variety of upgrades to ensure a good State of Repair of facility assets.  The project will be managed in two phases:

Phase 1 (September – January 2025, weather permitting):
  • Asphalt paving and repairs across various parking lot areas
  • Power distribution equipment install
  • Enhancing exterior lighting 

Phase 2 (January – May 2025):
  • Upgrading the building elevator
  • Power distribution upgrades
  • HVAC replacements

  • Q1 2024: Design 
  • Q4 2024: Construction commenced 
  • Q2 2025: Estimated project completion

Site Location:

1660 North Park Drive​

Contact Us

Email us at recreation@brampton.ca​​ or visit our Contact Us​ page to find additional information you may be looking for.​​​​​​​